• Optimization :


 


The user can choose the method of optimization of the bars. The choice of the method will be able to affect:

    • The number of found bars
    • Calculated times of cutting
    • Computing time


“Fast” method:

This choice is adapted for the projects of big size, i.e. the projects comprising much cut by section. The computing time will be faster and will not have impact on optimization.


“Optimized” method:

This choice will be adapted for the projects of small and average size. If it is used for the great projects the computing time will be much longer.


“Automatic” method:

As the comment indicates it, it is the utility which chooses the most suitable algorithm according to the size of the project.


The ranking of the bars can be obtained by increasing or decreasing size or the reference mark.