Possible operation on the parts, the assemblies or drawings.

This operation makes it possible to place a title in the report of control.

The report must, as a preliminary, be created.

The choice of the report is done while choosing among the list of the operations having created reports of control.


Example : A title will be ''Always'' placed in the '' reportRapport.txt'' by specifying itLocation and the name of the processed document.