Operation possible on parts.

This operation manages the blocking bar on part files.


- Manage position :


Lower the blocking bar at the bottom of the design tree or deactivate it (Blocking bar at the top of the design tree).


 


- Update on which configuration :


Update active configuration or all configurations.