Operation possible on parts, assemblies or drawings.

This operation places the list of external references "In case of ..." in the inspection report.

The report must first be created.

The report is selected from the list of operations that have created inspection reports.


Example : The list of external references will be added to the report ''.Report.txt'' in case of ''Successof the operation.